Depth to limestone, and why quotes vary
Pier price is mostly pier depth, and depth here varies. NRCS soil descriptions give the numbers: Barfield, the county's largest soil series by acreage, is a shallow clay with limestone at about 18 inches, while Decatur and Dewey soils run more than 60 inches to bedrock and Colbert from 40 to more than 72 inches. The bedrock is the Tuscumbia Limestone, a cherty limestone 20 to 150 feet thick from Huntsville westward, and it is karst. The Geological Survey of Alabama lists a drop in the water table from drought and heavy weight at the ground surface among sinkhole triggers, and a 2006 study of Redstone Arsenal reported 1,886 mapped sinkholes and solution cavities in about 70 percent of bedrock boreholes.
A pier can therefore hit rock at a few feet on one corner and keep going on the next, which is why the load test matters. Push piers are driven until they reach a pressure that proves bearing against the structure's weight; helical piers are turned to a specified torque that correlates to capacity. The written quote should state the assumed depth, the price per additional foot, and what happens if a pier does not reach a satisfactory test load.
Above the rock, about 17.5 percent of Madison County acreage is in soils with a high or very high shrink-swell rating per NRCS SSURGO (Limestone County: about 1.3 percent), and September, at 3.49 inches, is the driest month against December's 5.87. Read more in Madison County soils and sinkholes.